You don't have javascript enabled. Good luck with that.
Pencarian
Halte Dukuh Atas 2 Beroperasi Kembali dengan Wajah Baru

Dukuh Atas 2 Bus Stop Resumes Operation with New Face

The Dukuh Atas 2 Transjakarta bus stop located in South Jakarta has been resumed operations since Saturday (5/20).

Hopefully, this operation can further facilitate community mobility

PT Transjakarta Secretary Division Head, Apriastini Bakti Bugiansri said the Dukuh Atas 2 Bus Stop was temporarily closed on December 4, 2019 due to the construction of Jabodebek LRT (Light Rail Transit) station.

"Now customers can do activities and return to using the Dukuh Atas 2 Bus Stop with a new face carrying the open air concept," shd expressed, Monday (5/22).

Transjakarta Trials Ragunan - Kuningan Timur Travel Time 35 Minutes

As for the information, Dukuh Atas 2 Bus Stop serves corridor 4 with Pulogadung 2 - Dukuh Atas 2 route, Corridor 6 with Ragunan - Dukuh Atas 2 route, route 6Q Dukuh Atas - Kasablanka via Epicentrum, and route M4 Pulogadung 2 - Dukuh Atas 2 AMARI (Night Buses).

The Dukuh Atas 2 bus stop is completed with a prayer room, disabled toilets, and public toilets, CCTV cameras, and access to a crossing bridge (JPO) to Dukuh Atas 1 Bus Stop.

"Dukuh Atas 2 Bus Stop is also connected to the iconic Dukuh Atas 1 Bus Stop. Hopefully, this operation can further facilitate community mobility," she hoped.

Linked News
Popular News indeks
  1. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye865 personAldi Geri Lumban Tobing
  2. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye729 personBudhi Firmansyah Surapati
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye706 personAldi Geri Lumban Tobing
  4. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye646 personDessy Suciati
  5. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye586 personFakhrizal Fakhri